
You had a rep come out and run a lighting class. The guys were fired up for a week, and then nothing changed. I know why, because I was the rep. Before that I owned a lighting company for nine years. Now I train contractors and distributors on the part the rep doesn’t teach: selling the job, pricing it, installing it right, and running lighting as a business. No product line. You’re paying for somebody who’s done this and knows what works and what doesn’t.
This is not a course and it is not a seminar. We work together on your actual bids, your actual designs, and your actual jobs, whether that’s you or your whole crew. Every engagement starts with a free 20-minute strategy call where you tell me your biggest challenge and I tell you exactly where I'd start. From there we set a plan and meet regularly to work it. You get a coach who has stood where you're standing and has no products to sell you.
You lost the job before the other bid came in. How to qualify the homeowner on the phone, walk the property so the value is built before you talk numbers, and present a bid you don’t have to apologize for.
Most contractors don’t know what a lighting job actually costs them, so they bid to lose. True cost per day, the smallest job you’ll take, how to stay the highest bid and not discount when they push, and the maintenance contract that keeps the job paying.
Callbacks are almost always wiring, connectors, splices, and transformer loading. How to design and build a system you don’t have to go back to, with whoever’s fixtures you want to use.
You’ve been turning down lighting jobs, or installing them when the customer asks and never selling them. Starting the division from zero, or turning what you have into something that runs without you on every job.
You lost that job before the other guy's bid even came in. You didn't qualify the client correctly, you didn't walk them through the process correctly, and you didn't tell them to expect that you'd be more expensive than everybody else.
Homeowners always want to get you with a gotcha. "You were $8,000, and this other guy said he'd do the exact same thing for $6,000. What are you going to do about that?" They want you to fluster and falter and say, "I'll do it for $6,000."
No. You know more about this than the other guy. You're going to do a better job, with a better system.
You set that up at the beginning. It's how you qualify them over the phone. It's how you talk to them in the first conversation. It's how you talk about their property when you're walking it with them. It's how you present the bid.
I used to tell people straight up, "I will probably be the most expensive bid you get, by 30 percent." I never bid a lighting job where I wasn't the most expensive, and I never discounted. I've taken parts of a job out or changed things to bring a number down. I've never lowered a price.
People get lighting pricing wrong two ways. They think they have to be the absolute least expensive, when they don't. And they don't know what the lighting system truly costs them.
It's easy to look at a job and say: materials are $2,000, it'll take six hours, my labor rate is $100 an hour, add my 10 percent or my 30 percent, done. But that isn't your true cost, and that isn't how long the job is really going to take.
Start with the lights. Undercap lights take a lot longer than sticking a path light in the ground. You have to know what's really going on at that job site and account for all of it.
Then know what it truly costs you per day to run your business. If you're paying a guy $25 an hour and he's on that job for four hours, your cost isn't $100. It's the truck he drove to get there, the gas there and back, and a piece of the person answering the phone back at the office, who still has to get paid.
Know your true cost for a day and you can price the job. It also sets your floor, the smallest job you'll take. I wouldn't do a $500 lighting job. There's no way to make money driving out to a house for that, no matter what I do.
And when somebody just wants a rough price, there are several ways to do quick math that still keep you profitable.
If you're not actively trying to get them, you're not going to get them.
I'm not going to talk to you about pay per click, and I'm not going to just tell you to talk to your existing customers. Everybody can do that. Here are two places lighting jobs are already sitting.
Other landscapers. Plenty of them don't do lighting. Go ask them for the referral, and pay for it. I paid a percentage of every sold job back to the landscaper who sent it, and there's a formula for what that number should be.
There's one rule if you do this: don't step on their toes. If you're on that property doing the lighting and the homeowner asks you to rebuild a retaining wall, and the guy who sent you is the one who builds retaining walls, that work goes back to him.
Your distributor. Homeowners walk into those branches all the time. They have no idea how to do lighting, and they're always looking for somebody. Work your branch and ask for those referrals.
Then there's your existing customers, but not the way you think. There are ways to farm more lighting out of them. That's a different conversation, and it's something I teach.
Callbacks on lighting jobs fall into three categories: material failures, installation and process failures, and acts of God.
You're never going to eliminate the acts of God. A squirrel's going to chew through a wire. Somebody's going to back into a light next to a driveway. No system is going to be without callbacks, and those are callbacks you can charge for.
There's not a whole lot you can do about material failures either. You can use the best manufacturers and the best materials you can find, with warranties and guarantees, and it will still fail on occasion.
Installation and process is where you make up for all of that. How are your systems being wired? What kind of connectors are you using? How are you loading your transformers? How are your splices being made? Are you putting wire in places where an act of God is going to happen?
Here's one. Anywhere my wire crossed from the lawn into a landscape bed, I put about a foot of conduit over it on both sides. I knew a maintenance crew was going to come down that line with an edger, and when they did, it didn't cut my wire.
The rules you install by and the materials you use are what solve your callbacks.
I look at lights like a toolbox. I want the right tool for the right job. If all you've got is a hammer, everything has to be a nail.
I ran a distribution branch, and then I was a lighting contractor for nine years. I put these fixtures in the ground myself, and I never used 100 percent of any one manufacturer. One might have a great well light and a lousy transformer. Another has great path lights, and their bullet lights aren't very good.
After that I spent seven years with a lighting manufacturer. I've been the guy telling you ours was the best. Most lighting training is free because someone is selling you fixtures at the end of it, and nobody running that class is going to tell you which of their lights to skip.
So I don't care whose stuff you buy or where you buy it from. The questions that matter are different ones. How do you evaluate a fixture? How do you find what works for you? And how do you narrow that down to a good working set, so it streamlines your lighting business?
A contractor asked me that. Fair question, here's my angle.
I was a lighting contractor for nine years before I ever worked for a manufacturer.
A manufacturer's class teaches you their product. I teach you what they leave out.
Sales: how to get lighting jobs, how to qualify the homeowner, how to walk the property, and how to close.
Design: true lighting design, not "we have the best well light, and here's where you usually use a well light."
Technical: how to build a system that doesn't get callbacks, and how to evaluate a fixture no matter whose name is on it.
I work one on one, so I only teach you what you don't know. If you already know voltage drop, we don't touch it. If you have lighting jobs, we use your actual jobs, so you sell more of them. If you don't have any yet, we start with how to get them.
We start with a 20 minute call, no charge. If I can't give you one actionable thing out of it, there's no reason to continue.
Sold it, designed it, installed it, and got the callbacks myself.
Big systems with real voltage drop, real load math, and real deadlines.
Three gold, two silver. Michigan Green Industry Association, Best Landscape Lighting Installation.
You’ve got four or five lighting lines on the shelf and nobody at the counter who can tell a contractor which one to pick and why. Or what to substitute when the fixture they came in for is out of stock. The outside guys sell irrigation, because that’s what they know. So lighting gets sold when a contractor walks in already knowing what they want, and the rest of the time it sits there.
I ran branches for two irrigation distributors and spent seven years on the manufacturer side doing counter days at places like yours. The problem isn’t your people and it isn’t the lines. Every line you carry has a job it’s built for and a contractor it’s priced for. Nobody’s ever laid that out for your counter and your outside reps, and nobody’s come back the month after to see if they’re using it.
That’s what I do. I map your lines to the jobs and the contractors, train your counter and outside team to sell from it, and I’m still there when the next lighting question walks in. No product line of my own, so I’m not steering anybody toward a particular shelf.
Rep agencies building a low voltage spec strategy, same deal. Book a call and we’ll talk.

Mark Natale, Founder, Viewpoint Lighting Consultants
I started landscaping at 15 with my buddy’s dad. I ran branches for two irrigation distributors, owned a landscape lighting company for nine years, and then spent seven years with a manufacturer running their sales across the West.
At every one of those stops I watched the same thing happen. Somebody decides lighting is going to be a priority this year. A class gets scheduled, or a counter day, or a spiff. Everybody shows up, or they don’t. Everyone leaves excited and fired up. Six months later, nothing’s changed.
It isn’t the rep’s fault. I was a good one, and I couldn’t fix it either. A rep has a territory to cover and a product to move. That’s the job. What the job doesn’t include is the part after the class: somebody checking in, somebody looking at the next bid with you, somebody still there in month three.
That’s the part I do. Not the class, the part after it. I work with you and your crew on your actual jobs, your actual pricing, your actual installs, until it sticks. You’re the one paying me, so I work for you.
Tell me your biggest challenge. I'll tell you exactly where I'd start. Every engagement begins with a direct conversation about what's holding your operation back. No boilerplate, no generic programs, no wasted time. If you're ready to stop competing on price and start leading with expertise, I want to hear from you.


